ALDOT Option 4

Design Presented at ALDOT's Meeting of May 3, 2005

Option 4
Downstream Replacement with Straight Bridge
(45 MPH Design Speed)

Back to ALDOT Meeting Page

Copyright © 2005 Mentone Area Preservation Association, Inc.  All rights reserved.